Well Engineering & Project Management

At Somer International Drilling, we approach well projects not merely as field operations, but as integrated engineering processes covering the entire lifecycle—from design to commissioning. We provide end-to-end engineering control for every well, meticulously considering reservoir characteristics, target depths, operational risks, and logistical conditions.

​

Our Goal: To deliver cost-effective, safe, and high-efficiency well projects by minimizing operational uncertainties.

Engineers doing well design and reservoir analysis in office for well engineering and project management

1

Well Design and Well Programs

Well architecture, casing-cementing schemes, BHA (Bottom Hole Assembly)/bit selection, and circulation parameters are evaluated alongside real-time field data. The Well Program is prepared based on target formations and operational conditions, with revisions managed through a planned management of change process.

2

Technical Field Supervision

At the operation site, well performance is secured by our experienced field engineers (Company Men/Supervisors) through:

  • Engineering oversight of daily operations,

  • Coordination of equipment and personnel,

  • Management of technical decision-making mechanisms during critical operations,

  • Instant monitoring and mitigation of operational risks.

3

QA/QC Processes

All field operations are audited within the scope of API, ISO, and internal quality procedures, covering:

  • Equipment conformity and compliance checks,

  • Accuracy of operational records,

  • HSE (Health, Safety, and Environment) and operational safety requirements. The Objective: To detect errors before they impact the field, thereby reducing operational losses and NPT (Non-Productive Time) to zero.

4

Project Planning, Monitoring, and Reporting

Transparent and measurable reporting is provided to the client/investor for every well through:

  • Time schedules (Depth vs. Days),

  • Budget tracking (AFE management),

  • Operation progress reports,

  • Daily, weekly, and monthly performance analyses. Thanks to this structure, deviations from the project schedule and cost overruns are brought under control at an early stage.

5

Integrated Management of Field Operations

All drilling, workover, swabbing, and production processes are managed with full coordination between:

  • Operations,

  • Logistics,

  • Technical Teams,

  • Vendors and Contractors. This ensures that all disciplines in the field work integrated under a single engineering perspective, maximizing operational efficiency.