top of page

Well Testing & Production Optimization

At Somer International Drilling, we deliver comprehensive well testing and production optimization services to identify the true production potential of wells and maximize the return on field investments.


All activities are carried out through a data-driven engineering approach based on field measurements, with a focus on long-term sustainability beyond short-term production gains.

Pressure and flow analysis by engineers monitoring the drilling site from the office within the scope of well tests and production optimization

1

Pressure, Flow Rate & Production Analysis

To accurately assess well performance, we perform:

  • Wellhead and reservoir pressure measurements,

  • Instantaneous and time-dependent flow rate analyses,

  • Multiphase flow behavior evaluations,

  • Field testing to characterize production performance,
    allowing a detailed assessment of the current well condition.

2

Reservoir Performance Evaluation

To understand actual reservoir behavior, we conduct:

  • Pressure depletion and reservoir response analyses,

  • Evaluation of drive mechanisms and flow regimes,

  • Reservoir–well interaction modeling,

  • Long-term production potential forecasting,
    supporting the development of optimized production strategies.

3

Production Bottleneck Identification

Mechanical and reservoir-related constraints limiting production are analyzed in detail, including:

  • Downhole flow restrictions,

  • Surface and equipment-related losses,

  • Formation damage and scaling effects,

  • Inappropriate completion and equipment configurations,
    enabling clear identification of production bottlenecks.

4

Production Optimization Solutions

Based on validated field data, we implement:

  • Completion and production equipment optimization,

  • Improvement of downhole flow conditions,

  • Reconfiguration of production parameters,

  • Recompletion and targeted intervention recommendations,
    to sustainably increase well production capacity.

5

An Engineering Approach Focused on Return on Investment

Our objective is not only to increase production, but also to:

  • Extend reservoir and well life,

  • Reduce operational risks,

  • Lower energy and operating costs,

  • Shorten payback periods for field investments.

Through this approach, we deliver measurable, long-term, and reliable production performance for our clients.

Contact Us

+90 212 234 56 78

info@somersondaj.com.tr

bottom of page